| | | | | | | | | | | | | Town of Castle Rock - Projects |
| | | | | Development Activity List |
| | | | | | Terrain North Basin Single Family Residential |
| | | | | | | | | | | | | | | | | Depicts the general layout and configuration of a site, typically including building footprints and elevations, parking and street layouts, conceptual landscaping and more. |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Site Development Plan for Phase 2 of Terrain North Basin (PA 8) is for the 29 single-family detached lots, associated roadways and infrastructure and 35.66 acres of open space on approximately 42 acres. The site is currently an undeveloped parcel of land adjacent to McMurdo Gulch and Castle Oaks Drive, located east of the intersection of Autumn Sage Street and Castle Oaks Drive. A portion of the Front Range Trail is abuts the east side of the proposed neighborhood. |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| |