| | | | | | | | | | | | | Town of Castle Rock - Projects |
| | | | | Development Activity List |
| | | | | | RHG Gilbert Street Warehouse Remodel |
| | | | | | | | | | | | | | | | | A Preapplication Meeting is an opportunity to meet with Town staff and discuss a preliminary project or idea, and learn what is required to move forward. |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Staff received a pre application meeting request seeking information on application and submittal requirements for a proposed Reach Higher Ground 14,250-square-feet warehouse remodel. The remodel includes a 4,250-square-foot office/reception area, and a relocation of the south-side main entrance to an existing east-side entrance. The proposed scope of work would keep the interior existing firewall in place, add a 9x10 sectional door with new curbed 20x10 concrete ramp, add a 15x4 foot pedestrian ramp with handrails, and add a wider 12x10 foot equipment ramp with bollard rails on each side which would include a 10x10 foot coiling roll down fire door. The proposed project is located at 17 South Gilbert Street. |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| |