| | | | | | | | | | |
| | Town of Castle Rock - Projects |
|
| |
| | Development Activity List |
| |
| |
| | Scileppi's Phase 2-patio replacement |
| |
| |
| | |
| | | |
| | |
| | | Engineered drawings for the construction of public infrastructure. |
| |
| |
| |
| | |
| | | |
| | | |
| |
| | | |
| | | | | |
| | |
| | | |
| | | |
| | |
| |
| | | Proposal to demolish the existing patio at the Old Stone Church, located at 210 Third St., and build a new patio within the same location. The proposed project is located southeast of the intersection of Jerry Street and Third Street. |
| |
| | |
| | | |
| | | |
| |
| |
| | | | |
| | |
| |
| | | | |
| | |
| |