| | | | | | | | | | |
| | Town of Castle Rock - Projects |
|
| |
| | Development Activity List |
| |
| |
| | The Brickyard - public infrastructure, Phase 1A-Grading Only |
| |
| |
| | |
| | | |
| | |
| | | Engineered drawings for the construction of public infrastructure. |
| |
| |
| |
| | |
| | | |
| | | |
| |
| | | |
| | | | | |
| | |
| | | |
| | | |
| | |
| |
| | An Early Grading Permit is being requested to initiate overlot grading of the Brickyard site while the utility and roadway design plans are still being finalized. Only grading is proposed in this submittal with no utility or roadway design included. The public infrastructure improvements as part of The Brickyard Development are being reviewed separately.
The property is located on Prairie Hawk Drive, north of Plum Creek Parkway and south of Topeka Way. |
| |
| | |
| | | |
| | | |
| |
| |
| | | | |
| | |
| |
| | | | |
| | |
| |