| | Civil Construction Documents to build the Public Infrastructure Improvements. The Brickyard Mixed-Use Development is an 18.8-acre site (31.2 acres overall) with hotel, restaurant, retail, office, conference venue, recreational space, and approximately 506 multifamily dwelling units. The property is located on Prairie Hawk Drive, north of Plum Creek Parkway and south of Topeka Way.
Major infrastructure improvements will include site grading, internal roadway construction, utility installation, regional water quality and detention pond. Off-site improvements included in this plan set consist of the construction of a new trail connection with downtown Castle Rock along the existing Industrial Tributary. |
| |