| | | | | | | | | | | | | Town of Castle Rock - Projects |
| | | | | Development Activity List |
| | | | | | Small Cell Castle Oaks Dr and Greenwater Cir |
| | | | | | | | | | | | | | | | | Engineered drawings for the construction of public infrastructure. |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | PROPOSED SMALL CELL LOCATED IN THE TOWN OF CASTLE ROCK RIGHT OF WAY 1. INSTALL NEW DUAL USE STREETLIGHT POLE 2. ANTENNAS MOUNTED ON POLE 3. METER (BY CORE) INSTALLED ON PEDESTAL (BY CORE) 4. DISCONNECT INTEGRATED INTO POLE (BY TILSON) |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| |